Bozshakol (Boschekul) gold mine
Report summary
Table of contents
- Summary
- Key issues
- CAPEX
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
06 December 2022
Rainy River gold mine project
Rainy River gold mine project
A detailed analysis of the Rainy River gold mine project.
$2,25012 December 2022
Huayue Nickel Cobalt HPAL nickel operation
Huayue Nickel Cobalt HPAL nickel operation
A detailed analysis of Huayue Nickel and Cobalt HPAL nickel operation
$2,25017 March 2023
Simandou (Blocks 3 and 4) iron ore mine
Simandou (Blocks 3 and 4) iron ore mine
Rio Tinto retains a 45% interest in Simandou and are currently revising its previously completed optimisation and feasibility studies.
$2,250