Asset report

Bozshakol (Boschekul) copper mine

This report is currently unavailable

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

In August 2012, Kazakhmys estimated that the initial capex required was US$1.9Bn. Project is close to existing power, transportation and other infrastructure.

What's included

This report contains

  • Document

    Bozshakol (Boschekul) copper mine

    PDF 1.00 MB

Table of contents

  • Key facts
    • Summary
    • Bozshakol is a copper gold project in north-east Kazakhstan. In August 2012, Kazakhmys estimated that the initial capex required was US$1.9Bn. This has since been revised up to US$2.15Bn by KAZ minerals. The project is close to existing power, transportation and other infrastructure.
    • Key issues
  • Location maps
    • CAPEX
  • Reserves and resources
    • Mining
    • Process
  • Production
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

Asset report

Teghout copper mine

Asset report

Karaganda copper mine

Asset report

Zhezkazgan copper mine

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898