Asset Report

Bracemac-McLeod zinc mine

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Matagami project includes nearly 3000 mineral claims covering 644km2. The operation was developed as a Joint Venture between Xstrata and Donner Metals which covered 4,753km2. Glencore now has sole control of the property covering the areas: South Flank JV area (includes Bracemac-McLeod, McLeod Deep, Orchan West), North Flank JV area, Central Camp JV area, West Camp area. It is most likely that all discoveries made within the areas listed will be treated at the existing Matagami Mill.

What's included

This report contains

  • Document

    Bracemac-McLeod zinc mine

    PDF 761.65 KB

  • Document

    Bracemac-McLeod zinc mine.xls

    XLS 596.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Production
    • Mining
    • Process
    • Capex
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 12 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Economic assumptions: Table 1
  • Operations: Table 1
  • Costs: Table 1
  • Costs: Table 2

Images

  • Detailed map
  • Production: Image 1
  • Costs: Image 1

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898