Asset Report

Bracemac-McLeod zinc mine

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

04 September 2018

Bracemac-McLeod zinc mine

Report summary

The Matagami project includes nearly 3000 mineral claims covering 644km2. The operation was developed as a Joint Venture between Xstrata and Donner Metals which covered 4,753km2. Glencore now has sole control of the property covering the areas: South Flank JV area (includes Bracemac-McLeod, McLeod Deep, Orchan West), North Flank JV area, Central Camp JV area, West Camp area. It is most likely that all discoveries made within the areas listed will be treated at the existing Matagami Mill.

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Production
    • Mining
    • Process
    • Capex
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 12 images and tables including:

  • Key facts: Table 1
  • Detailed map
  • Participation: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production: Image 1
  • Economic assumptions: Table 1
  • Operations: Table 1
  • Costs: Table 1
  • Costs: Image 1
  • Costs: Table 2

What's included

This report contains:

  • Document

    Bracemac-McLeod zinc mine

    PDF 1.19 MB

  • Document

    Bracemac-McLeod zinc mine.xls

    XLS 565.50 KB

Other reports you may be interested in

Browse reports by Industry Sector