Asset Report
Budel zinc smelter
Report summary
Located near Eindhoven in the Netherlands, the Budel smelter uses the roast-leach-electrowin process and has a production capacity of 260kt/a slab zinc. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Emissions
- 2022
- 2020
- 2019
- 2018
- 2017
- 2015
- Pre 2010
- 2000-2009
- 1990-1999
- 1970-1989
Tables and charts
This report includes 8 images and tables including:
- Budel Emission Intensity Quartile ranking – total global production - tonnes Zn
- Detailed map
- Flowsheet
- Feed Preparation
- Roaster and Acid Plant
- Leaching and Purification
- Tankhouse, Melting and Casting
What's included
This report contains:
Other reports you may be interested in
Asset Report
Tak zinc smelter
A detailed analysis of the Tak zinc smelter.
$2,250
Asset Report
Kunming zinc smelter
A detailed analysis of the Kunming zinc smelter.
$2,250
Asset Report
Hindustan Zinc (Pre-2005) (Closed) zinc mine
A detailed analysis of the Hindustan Zinc (Pre-2005) zinc mine.
$2,250