Asset report

Buenavista del Cobre (Cananea) copper minesite

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Up to Sep 2015 Buenavista was operating a 76.7kt/d concentrator and in this date they started a new 100kt/d concentrator. By 2016 they expect to increase the capacity of the old concentrator to 82kt/d raising the total mill capacity to 182kt/d in 2016. On the other hand the SxEw plant was expanded in June 2014 from 66kt/a cathode to 175.5 kt/a. As part of the integrated expansion process Buenavista will be operating in 2016 two moly plants with a capacity to produce 4.6kt Mo.

What's included

This report contains

  • Document

    Buenavista del Cobre (Cananea) copper minesite

    XLS 609.50 KB

  • Document

    Buenavista del Cobre (Cananea) copper minesite

    PDF 492.33 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Paticipation
  • Geology
  • Reserves and resources
  • Infrastructure
  • Costs
  • Production
  • Operations
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898