Asset report

Butcher Well (Closed) gold mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

A feasibility study to investigate various mining and treatment options commenced in November 1992 with the aim of commissioning an open pit mining operation in June 1993.

What's included

This report contains

  • Document

    Butcher Well (Closed) gold mine

    XLS 116.50 KB

  • Document

    Butcher Well (Closed) gold mine

    PDF 368.16 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898