Butler SDI steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
- Iron ore
- Coal
- Metallics
- Energy
- Capital costs
- Operating cash costs
Tables and charts
This report includes the following images and tables:
-
ParticipationDetailed mapSteel plant overview
-
Key raw materials ratesDownstream productsFinished steel productionProduction table (Mt)Capital costsTotal operating cash costs - Finished steelOperating cash cost tableEconomic assumptions
What's included
This report contains:
Other reports you may be interested in
Middletown steel plant
Single blast furnace steel plant producing flat-rolled and coated sheet. The planned DRI-EAF project was cancelled on weak economics.
$2,250Burns Harbor steel plant
Cliffs acquired the integrated plant in 2020; it runs two BFs. BF D suffered a major issue in 2020, and BF C is set for relining in 2027.
$2,250Indiana Harbor West steel plant
A steel plant with two blast furnaces, both now idled—BF 4 in 2022—now operating solely downstream within Cliffs’ Indiana Harbor hub.
$2,250