Asset report

Buzwagi gold mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Buzwagi is an open pit mining operation and the smallest of Acacia Mining`s three gold producing mines. Commercial production commenced in 2009 and in 2013 mine life was shortened following a decision to suspend a final cut back of the open pit. In 2016 the mine produced 162koz of gold.Based on existing reserves mining activity is expected to cease in 2017 followed by stockpile processing until 2020. Development of a closure plan is on going with various closure options under consideration.

What's included

This report contains

  • Document

    Buzwagi gold mine

    XLS 125.00 KB

  • Document

    Buzwagi gold mine

    PDF 785.31 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Infrastructure
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898