Asset Report

Chanderiya (ISF) zinc smelter

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

09 June 2017

Chanderiya (ISF) zinc smelter

Report summary

The Chanderiya ISF smelter was commissioned in late 1991 to treat zinc and lead concentrates from the Rampura-Agucha Mine.  Capacity at commissioning was 70kt/a zinc and 35kt/a lead.  The complex also includes a lead refinery, a precious metals refinery, bismuth and mercury plants, and a plant to produce copper cathode from copper dross arising from lead refining.  The capital cost of the total installation was US$125M.  Following a number of commissioning problems, production became more...

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
    • Location / Transport
    • Conc. Receipt / Storage
    • Sinter Plant
    • Acid Plant
    • Smelting Furnace
    • Refining
    • Casting Plant
    • Slag Disposal
    • Other
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 10 images and tables including:

  • Key facts: Table 1
  • Location maps: Image 1
  • Participation: Table 1
  • Flowsheet
  • Products: Image 1
  • Products: Table 1
  • Products: Table 2
  • Costs: Image 1
  • Costs: Table 1
  • Economic assumptions: Table 1

What's included

This report contains:

  • Document

    Chanderiya (ISF) zinc smelter

    PDF 975.92 KB

  • Document

    Chanderiya (ISF) zinc smelter.xls

    XLS 473.00 KB