Chanderiya zinc smelter

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The construction of a 60-100kt/a electrolytic zinc smelter by HZL in Rajasthan, originally scheduled to be commissioned in 2004 has been highly probable for some years. The original intended location was Kapasan but, in 2003, it was decided to locate it at Chanderiya, on the same site as the existing ISF zinc-lead smelter complex. It consumes Rampura-Agucha concentrates that were being exported i.e.-domestic concentrates, and this mine has been expanded to continue the surplus...

Table of contents

  • Summary:
    • Emissions
    • 2023
    • 2018
    • 2016
    • Pre 2010
    • 2000-2009

Tables and charts

This report includes 8 images and tables including:

  • Chanderiya Emission Intensity Quartile ranking – total global production - tonnes Zn
  • Detailed map
  • Flowsheet
  • Feed Preparation
  • Roaster and Acid Plant
  • Leaching and Purification
  • Tankhouse, Melting and Casting

What's included

This report contains:

  • Document

    Chanderiya zinc smelter

    PDF 1.58 MB