Asset Report

Chifeng Jinjian copper refinery

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

30 November 2018

Chifeng Jinjian copper refinery

Report summary

The Jinjian refinery was commissioned in 2003 with an initial capacity of 20kt/a pf copper cathode. A 40kt/a expansion was started in 2005 and was commissioned by the end of 2006. The cost of the expansion was approximately $10M. The capacity as of 2010 was 100kt/a of copper cathode. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Production

Tables and charts

This report includes 7 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Chifeng Jinjian copper refinery.xls

    XLS 630.00 KB

  • Document

    Chifeng Jinjian copper refinery

    PDF 1.06 MB

  • Document

    Chifeng Jinjian copper refinery

    ZIP 1.12 MB

Trusted by leading organisations