Asset report

Chifeng zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The original smelter at Chifeng had a capacity of 21kt/a and was commissioned in 1995. This was expanded to 50kt/a in 2003 with the addition of a separate roasting facility at Lindong. A Phase III expansion brought capacity to 110kt/a and the Phase IV expansion was located on a site next to the existing smelter and was commissioned in 2011.The capacity of the smelter is now around 210kt/a and unusually for a Chinese zinc smelter uses the jarosite process for leach residue treatment.

What's included

This report contains

  • Document

    Chifeng zinc smelter

    PDF 684.41 KB

  • Document

    Chifeng zinc smelter.xls

    XLS 526.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Projects
  • Process overview
  • Products
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet
  • Production
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Feed preparation
  • Roaster & Acid plant
  • Leaching & Purification
  • Tankhouse, melting & Casting
  • Products: Table 1
  • Products
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898