Asset report

Chifeng zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The original smelter at Chifeng had a capacity of 21kt/a and was commissioned in 1995. This was expanded to 50kt/a in 2003, with the addition of a separate roasting facility at Lindong. A Phase III expansion brought capacity to 110kt/a and the Phase IV expansion was located on a site next to the existing smelter and was commissioned in 2011.The capacity of the smelter is now around 210kt/a, and unusually for a Chinese zinc smelter uses the jarosite process for leach residue treatment.

What's included

This report contains

  • Document

    Chifeng zinc smelter

    PDF 684.40 KB

  • Document

    Chifeng zinc smelter.xls

    XLS 522.00 KB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Projects
  • Process overview
  • Products
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet
  • Production
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Feed preparation
  • Roaster & Acid plant
  • Leaching & Purification
  • Tankhouse, melting & Casting
  • Products: Table 1
  • Products
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898