China halts steel capacity swap projects to tame expansion
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Executive summary
- China to review all capacity swap projects
- Swap scheme loopholes to be closed
- Review measures should result in less capacity
Tables and charts
This report includes the following images and tables:
- China’s total capacity will inch up from 2020 as a result of the capacity swap scheme
- More than 270 Mtpa of replacement capacity, – at the operating, construction or planning stage, – is subject to review
- Examples of new projects (non-exhaustive)
What's included
This report contains:
Other reports you may be interested in
China regas tracker 2025
Monthly update of LNG receiving terminals projects, storage capacity forecasts and available window slots offered by PipeChina
$950PT Virtue Dragon nickel operation
Cost analysis of Virtue Dragon NPI plant, Indonesia
$2,250PT Indoferro nickel operation
PT Indoferro started producing NPI from its blast furnace operation in August 2012.
$2,250