Asset Report

Colquijirca (El Brocal) zinc mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

El Brocal processes Pb-Zn ore from its Tajo Norte open pit mine and copper ore with the high arsenic from Marcapunta Norte underground mine. There are two processing plants. Plant 1 with a capacity of 7kt/d and Plant 2 with a capacity of 11kt/d. Full milling capacity of 18kt/d was achieved on 4Q 2015. In 2021 El Brocal was facing medium/long term challenges at both the lead-zinc circuit and the copper circuit. The lead-zinc circuit faces the limited amount of Pb-Zn reserves. The Tajo Norte pit was subsequently put under care and maintenance from Q4 2023. After this, the Pb-Zn plant (Plant 2) is to process only copper ore (actually becoming a copper mine) from the southern end of the pit and from Marcapunta.

Table of contents

  • Summary
  • Key issues
    • Detailed map
  • Mining
  • Processing
  • CAPEX
  • Operating
  • Royalties and taxes

Tables and charts

This report includes 2 images and tables including:

  • Colquijirca (El Brocal) Zinc Mine Emission Intensity Quartile Ranking – total global production - tonnes Zn equivalent

What's included

This report contains:

  • Document

    Colquijirca (El Brocal) zinc mine

    XLS 483.00 KB

  • Document

    Colquijirca (El Brocal) zinc mine

    PDF 1.26 MB

  • Document

    Colquijirca (El Brocal) zinc mine

    ZIP 1.11 MB