Asset Report
Copper Rand copper mine
Report summary
The accompanying analysis deals with production from 2005 onwards at the re-opened Copper Rand underground mine up until its closure in 2008. As at 2013, restart options were being considered but is not included in the accompanying analysis. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Operating
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Black Butte copper mine project
A detailed analysis of the Black Butte copper mine project.
$2,250
Asset Report
Mount Polley copper mine
A detailed analysis of the Mount Polley copper mine.
$2,250
Asset Report
Thalanga Restart copper mine
A detailed analysis of the Thalanga Restart copper mine
$2,250