Asset Report

Curraghinalt gold mine project

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

Curraghinalt will be an underground operation utilising sublevel longhole open stoping, cut and fill and longhole upper stoping mining methods. The mine has an estimated life of 11 years. The process plant will have a design capacity of 1.4kt/d and comprise a conventional crushing, milling and carbon-in-leach (CIL) circuit. 

What's included

This report contains

  • Document

    Curraghinalt gold mine project

    XLS 120.00 KB

  • Document

    Curraghinalt gold mine project

    PDF 615.78 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Tables

  • Key facts: Table 1

Images

  • Detailed map

You may be interested in

Asset Report

Hope Bay gold mine

Asset Report

Gounkoto gold mine

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898