Asset report

Curraghinalt gold mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Curraghinalt will be an underground operation utilising sublevel longhole open stoping cut and fill and longhole upper stoping mining methods. The mine has an estimated life of 11 years. The process plant will have a design capacity of 1.4kt/d and comprise a conventional crushing milling and carbon in leach (CIL) circuit.

What's included

This report contains

  • Document

    Curraghinalt gold mine project

    XLS 120.00 KB

  • Document

    Curraghinalt gold mine project

    PDF 615.56 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Costs
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898