Asset Report

Danxia (Fankou) zinc smelter

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

09 June 2017

Danxia (Fankou) zinc smelter

Report summary

The Danxia (Fankou) smelter was commissioned in 1995. The original smelter operation was a miniature electrolytic plant with a capacity of 20kt/a. In 2007 it was announced that the Danxia smelter would be expanded by 100kt/a to 120kt/a by installing a two-stage pressure leach circuit.

Table of contents

Tables and charts

This report includes 14 images and tables including:

  • Key facts: Table 1
  • Location maps: Image 1
  • Participation: Table 1
  • Flowsheet
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Process overview: Table 4
  • Products: Image 1
  • Products: Table 1
  • Products: Table 2
  • Costs: Image 1
  • Costs: Table 1
  • Economic assumptions: Table 1

What's included

This report contains:

  • Document

    Danxia (Fankou) zinc smelter.xls

    XLS 460.00 KB

  • Document

    Danxia (Fankou) zinc smelter

    PDF 1.19 MB

Other reports you may be interested in

Browse reports by Industry Sector