Asset Report
Daye copper smelter
Report summary
The smelter is located in Huanshi City, Hubei Province. The capacity of the smelter is 1.5Mt/a of concentrate treated (470kt/a anodes produced). Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
Tables and charts
This report includes 6 images and tables including:
- Daye Emission Intensity Quartile ranking - total global production - tonnes Cu
- Detailed map
- Flowsheet
- Feed preparation
- Smelting process
- Auxiliary plants
What's included
This report contains: