Asset Report
Decar nickel project
Report summary
A large open pit recovering nickel as a nickel-iron awaruite concentrate with minimal sulphur content. There are no comparable nickel concentrates to guide offtake terms and we have assumed a net payability of 75%. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Mining
- Process
Tables and charts
This report includes 5 images and tables including:
What's included
This report contains: