Asset Report

Dikulushi copper mine

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Dikulushi copper mine started production back in 2002 as an open pit operation, producing copper-silver concentrate. The operation was placed on care and maintenance in January 2015. JCHX Mining Management acquired Dikulushi operations from Anvil Mining Congo for $2.75 million in August 2019. Operation was restarted in December 2021. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

Tables and charts

This report includes the following images and tables:

  • Detailed map

What's included

This report contains:

  • Document

    Dikulushi copper mine

    XLS 400.50 KB

  • Document

    Dikulushi copper mine

    PDF 1.20 MB