Dongmau EAF - Closed nickel operation

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Located in Lianyungang City, Jiangsu. Construction commenced in September 2009 with commissioning planned for H2 2010. Design capacity is 1Mt/a of NPI (ca. 30kt Ni/a) with a total capital investment of RMB 650M. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • No table of contents specified

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    Dongmau EAF nickel operation

    XLS 170.00 KB

  • Document

    Dongmau EAF - Closed nickel operation

    PDF 1.23 MB

  • Document

    Dongmau EAF - Closed nickel operation

    ZIP 1.12 MB