Asset Report

Yuanjiang - Closed nickel operation

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The mine started a pilot plant in 2001 with production less than 50t/a. In February 2005 the operation was merged with YunXi Group and the pilot plant was expanded into a commercial operation in 2006. The mine is a laterite nickel producer. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    Yuanjiang Nickel Mine nickel operation

    XLS 183.50 KB

  • Document

    Yuanjiang - Closed nickel operation

    PDF 1.29 MB

  • Document

    Yuanjiang - Closed nickel operation

    ZIP 1.09 MB