Asset Report

El Monte zinc mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

El Monte has processed ore from a number of mines since starting production in 1975. The operation was placed on care-and-maintenance in 2008 due to low metal prices and a labour dispute but was subsequently restarted in 2010. Mine production has struggled to reach targets since 2010 due to insufficient underground development and dewatering issues. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Emissions
  • Mining
  • Processing
  • Royalties and taxes

Tables and charts

This report includes 2 images and tables including:

  • El Monte Emission Intensity Quartile Ranking - Total global production - Tonnes Zn equivalent
  • Detailed map

What's included

This report contains:

  • Document

    El Monte zinc mine

    XLS 439.00 KB

  • Document

    El Monte zinc mine

    PDF 1.44 MB

  • Document

    El Monte zinc mine

    ZIP 1.12 MB