Asset report

El Porvenir zinc mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

El Porvenir operates a mechanised overhand cut and fill underground mine and a conventional 5.6kt/d concentrator producing zinc lead and copper concentrates. Between 2017 and 2019 El Porvenir is expected to invest US$ around 30 million to make progressive incremental expansions from 5.6kt/d ore to 6.5kt/d (2018) and then to 9kt/d ore in 2020. This is included in our analysis.

What's included

This report contains

  • Document

    El Porvenir zinc mine

    PDF 644.82 KB

  • Document

    El Porvenir zinc mine.xls

    XLS 757.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Production
  • Operations
  • Costs
  • Fiscal and regulatory
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 12 images and tables including:

Images

  • Detailed map
  • Production: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Economic assumptions: Table 1
  • Operations: Table 1
  • Costs: Table 1
  • Costs: Table 2

You may be interested in?

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898