Asset report

El Porvenir zinc mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

El Porvenir operates a mechanised overhand cut and fill underground mine and a conventional 5.6kt/d concentrator, producing zinc, lead and copper concentrates. Between 2017 and 2019 El Porvenir is expected to invest US$ around 30 million to make progressive incremental expansions from 5.6kt/d ore to 6.5kt/d (2018) and then to 9kt/d ore in 2020. This is included in our analysis.

What's included

This report contains

  • Document

    El Porvenir zinc mine

    PDF 645.16 KB

  • Document

    El Porvenir zinc mine.xls

    XLS 801.00 KB

Table of contents

Tables and charts

This report includes 12 images and tables including:

Images

  • Detailed map
  • Production: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Economic assumptions: Table 1
  • Operations: Table 1
  • Costs: Table 1
  • Costs: Table 2

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898