The Century mine restart consists of the treatment of the Century Tailings deposit with a throughput rate of 15Mt/a. The average output is planned to be about 270kt of zinc in the zinc concentrate in full operating years. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key Issues
-
Emissions
- Detailed map
- Mining
- Processing
- Power
- Water
- Port
- Camp Site
- CAPEX
- Royalties
Tables and charts
This report includes 2 images and tables including:
- Century Tailings Emission Intensity Quartile ranking – total global production - tonnes Zn equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Shouxin Tailings zinc mine
A project to recover copper and zinc from the iron ore tailings of Shougang Hierro Peru.
$2,250
Asset Report
Hellyer Tailings (Closed) zinc mine
A detailed analysis of the Hellyer Tailings zinc mine.
$2,250
Asset Report
Hellyer Tailings Restart zinc mine
A detailed analysis of the Hellyer Tailings Restart zinc mine.
$2,250