Asset Report

Garpenberg zinc mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Garpenberg mine and mill has been in operation since 1953 and the original mine infrastructure including the main production shaft was located a long distance from active stopes. As a consequence, the mine and mill has undergone multiple expansions, first from 1.5Mt/a to 2.5Mt/a with a new production shaft servicing the mine and new concentrator. Between 2017 and 2020, another expansion raised throughput to 3Mt/a. Limited additional capex was needed and was used for a paste plant and mill de-bottlenecking, development, and a tailings expansion. In 2022, the mine has set its focus on expanding production to 3.3Mt/a by 2023.

Table of contents

  • Summary
  • Emissions
  • Mining
  • Processing

Tables and charts

This report includes 4 images and tables including:

  • Garpenberg Emission Intensity Quartile ranking – total global production - tonnes Zn equivalent
  • Detailed map

What's included

This report contains:

  • Document

    Garpenberg zinc mine

    XLS 520.50 KB

  • Document

    Garpenberg zinc mine

    PDF 1.64 MB

  • Document

    Garpenberg zinc mine

    ZIP 1.11 MB