Asset Report
Glencore Sudbury nickel operation
Report summary
Glencore currently operate two mines in the Sudbury Basin, Nickel Rim South (ca. 20 kt/a nickel in concentrate) and Fraser Morgan (ca. 6 kt/a nickel in concentrate). Ore is processed at the Strathcona mill. Our analysis assumes the development of Onaping Deeps with production commencing in 2021 at a capital cost of $750 million. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Emissions
- Mining
- Process
-
Smelting
- Cashflow
Tables and charts
This report includes 9 images and tables including:
- Glencore Sudbury Emission Intensity Quartile Ranking - total global production - tonnes Ni equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
KGHM Sudbury nickel operation
A detailed analysis of the KGHM nickel operation.
$2,250
Asset Report
Glencore Sudbury copper mine
A detailed analysis of the Glencore Sudbury copper mine.
$2,250
Asset Report
Vale Sudbury nickel mine
A detailed analysis of the Vale Sudbury nickel mine.
$2,250