Asset report

Golden Bear (Closed) gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

  • An error has occurred while getting captcha image

Report summary

A 155km access road was built to connect the mine to the town of Dease Lake. The mine operated on a fly-in/fly-out basis. The mine operated on a very short season from May to October due to the weather. Repadre Capital Corp was granted a 2% NSR royalty in 1993, on production from the property in return for a loan worth C$1.0M.  The mine was subject to NSR royalties totalling 4%.  Kodiak B and C and Grizzly deposits are only subject to a 2% NSR royalty.

What's included

This report contains

  • Document

    Golden Bear (Closed) gold mine

    XLS 122.00 KB

  • Document

    Golden Bear (Closed) gold mine

    PDF 850.77 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
    • Mining
    • Process
  • Timeline

Tables and charts

This report includes 2 images and tables including:


  • Detailed map


  • Key facts: Table 1

You may be interested in


Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898