Asset report

Golden Bear (Closed) gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

A 155km access road was built to connect the mine to the town of Dease Lake. The mine operated on a fly in/fly out basis. The mine operated on a very short season from May to October due to the weather. Repadre Capital Corp was granted a 2% NSR royalty in 1993 on production from the property in return for a loan worth C$1.0M. The mine was subject to NSR royalties totalling 4%. Kodiak B and C and Grizzly deposits are only subject to a 2% NSR royalty.

What's included

This report contains

  • Document

    Golden Bear (Closed) gold mine

    XLS 122.00 KB

  • Document

    Golden Bear (Closed) gold mine

    PDF 850.77 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898