Goltsovoye lead mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Mining
- Process
Tables and charts
This report includes the following images and tables:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Zouerate System iron ore mine
High stripping costs while developing deposits may put further pressure on the cost to go northwards at the Zouerate System mines.
$2,250Bibiani mine
A detailed analysis of the Bibiani Gold Mine.
$2,250El Aouj iron ore mine
A feasibility study for Stage 1 of the 11 Mtpa El Aouj deposit was completed at the end of 2015; the mine will start operating in Q1 2027.
$2,250