Asset report

Hackett River copper mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Several massive sulphide deposits have been identified and the most significant are the East Cleaver Boot Lake and Main Zone deposits. The East Cleaver deposit is located 1km to the west of Boot Lake. The Main Zone deposit is 2.8km west of the Boot Lake deposit. The success of this project hinges on the development of key infrastructure in the Bathurst Inlet Nunavut. As at March 2016 the Bathurst Inlet road port (BIRP) project remained under evaluation. The mining plan is based on the 2010 PEA although resource additions have been made since then.

What's included

This report contains

  • Document

    Hackett River copper mine project

    XLS 544.00 KB

  • Document

    Hackett River copper mine project

    PDF 611.87 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Infrastructure
  • Costs
  • Operations
  • Sales contracts
  • Timeline

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898