Asset report

Halilaga gold mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The Halilaga project is a low grade greenfield copper gold porphyry deposit. The accompanying analysis is based on an updated Preliminary Economic Assessment study whose results were published in Q1 2015. The study envisages a 14 year operation with an average mill throughput rate of 25kt/a. Mining will be by conventional open pit methods with an assumed life of mine stripping ratio of 1.3:1. The ore will be treated in a typical differential flotation plant producing a gold copper concentrate.Payable copper and gold production over the 14 year mine life is expected to be 780Mlb Cu and 925koz of Au.

What's included

This report contains

  • Document

    Halilaga Project gold mine

    XLS 128.00 KB

  • Document

    Halilaga gold mine project

    PDF 1.01 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Infrastructure
  • Costs
  • Operations
  • Sales contracts
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898