Asset report

Halilaga gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Halilaga project is a low grade greenfield copper gold porphyry deposit. The accompanying analysis is based on an updated Preliminary Economic Assessment study whose results were published in Q1 2015. The study envisages a 14 year operation with an average mill throughput rate of 25kt/a. Mining will be by conventional open pit methods with an assumed life of mine stripping ratio of 1.3:1. The ore will be treated in a typical differential flotation plant producing a gold copper concentrate.Payable copper and gold production over the 14 year mine life is expected to be 780Mlb Cu and 925koz of Au.

What's included

This report contains

  • Document

    Halilaga Project gold mine

    XLS 128.00 KB

  • Document

    Halilaga gold mine project

    PDF 1.01 MB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898