Asset Report

Halilaga gold mine project

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Halilaga project is a low-grade greenfield copper-gold porphyry deposit. The accompanying analysis is based on an updated Preliminary Economic Assessment, study whose results were published in Q1, 2015. The study envisages a 14 year operation with an average mill throughput rate of 25kt/a. Mining will be by conventional open pit methods with an assumed life-of-mine stripping ratio of 1.3:1. The ore will be treated in a typical differential flotation plant producing a gold-copper concentrate. Payable copper and gold production over the 14 year mine life is expected to be 780Mlb Cu and 925koz of Au.

What's included

This report contains

  • Document

    Halilaga Project gold mine

    XLS 128.00 KB

  • Document

    Halilaga gold mine project

    PDF 1.01 MB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Tables

  • Key facts: Table 1

Images

  • Detailed map

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800