Asset Report

Hasbrouck & Three Hills gold mine project

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The property comprises the Hasbrouck and Three Hills deposits. Both deposits will be mined using conventional truck and shovel open pit mining methods. Ore from the mines will be treated via heap leaching. A staged project development approach is being considered where the Three Hills deposit will be developed as Phase 1, followed by development of the Hasbrouck deposit as Phase 2. Three Hills ore will be placed onto pads as run-of-mine ore at a rate of 15ktons/d while ore from Hasbrouck will be crushed prior to placement on leach pads at a rate of 17.5ktons/d. An eight year mine life is planned, with average annual gold production estimated at 69koz/a in years 1 & 2 (Three Hills deposit) and 71koz/a between years 3 and 8 (Hasbrouck deposit). In addition, average annual silver production of 194koz/a is expected between years 3 and 8 from the Hasbrouck deposit.

What's included

This report contains

  • Document

    Hasbrouck & Three Hills Project gold mine

    XLS 120.50 KB

  • Document

    Hasbrouck & Three Hills gold mine project

    PDF 570.26 KB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Geology
      • The property comprises two main deposits (Hasbrouck and Three Hills) located 8km apart. Open-pit, truck and loader mining methods will be used at both deposits. Mining will be carried out by contractors based on labour numbers of up to 80 people working two, 12 hour shifts per day every day of the week.
      • Initial production will commence from the Three Hills deposit (Phase 1), and is expected to continue for two years. Mining at the Hasbrouck deposit is expected to commence in year two (Phase 2), and is expected to continue for seven years.
      • Combined life of mine strip ratio (waste:ore) is estimated at 1.1:1 (0.9:1 at Three Hills and 1.1:1 at Hasbrouck) over a nine year mine life.
    • Processing
  • Infrastructure
    • CAPEX
    • Royalties & Taxes
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Tables

  • Key facts: Table 1

Images

  • Detailed map

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898