Asset report

Heva-Hosco (Joanna) gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Heva Hosco is planned as an open pit operation utilising conventional mining methods. Mine life has been estimated at 13 years. The process plant is expected to comprise flotation/filtration tanks an autoclave recovery process and carbon in pulp (CIP) adsorption.Gold production is estimated at 100 130koz/a.

What's included

This report contains

  • Document

    Joanna Project gold mine

    XLS 125.00 KB

  • Document

    Heva-Hosco (Joanna) gold mine project

    PDF 466.64 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898