Asset Report

Heva-Hosco (Joanna) gold mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Heva-Hosco property is located in the Joannes Township, 20km east of Rouyn-Noranda in Quebec. The property is comprised of the two distinct deposits, the free-milling Heva deposit and the refractory ore Hosco deposit. Heva-Hosco is planned as an open pit operation utilising conventional mining methods. The process plant is expected to comprise flotation/filtration tanks, an autoclave recovery process and carbon in pulp (CIP) adsorption. Mine life has been estimated at 13 years, with average annual gold production estimated to be between 100 - 130koz. Limited work has been undertaken on the deposits since 2014. Until further information is available, the accompanying analysis therefore assumes a tentative start date of 2025.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • CAPEX

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Joanna Project gold mine

    XLS 116.00 KB

  • Document

    Heva-Hosco (Joanna) gold mine project

    PDF 1.27 MB

  • Document

    Heva-Hosco (Joanna) gold mine project

    ZIP 976.62 KB