Asset Report

Hitachi copper refinery

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

15 January 2018

Hitachi copper refinery

Report summary

The refinery is located at Hitachi, Ibaraki prefecture and has good road and sea links. Smelting operations commenced at Hitachi in 1908 to treat material from the Hitachi mine.  No.1 tankhouse was commissioned in 1911 and capacity had reached 72kt/a cathode by 1969.  No. 2 tankhouse was commissioned in 1969 with a capacity of 120kt/a cathode and No. 1 tankhouse was shut down in 1983.  The Hitachi smelter was closed in 1976, subsequently; anodes have been supplied from the Saganoseki smelter...

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 8 images and tables including:

  • Key facts: Table 1
  • Detailed map
  • Participation: Table 1
  • Products: Image 1
  • Products: Table 1
  • Costs: Image 1
  • Costs: Table 1
  • Economic assumptions: Table 1

What's included

This report contains:

  • Document

    Hitachi copper refinery

    PDF 1.01 MB

  • Document

    Hitachi copper refinery.xls

    XLS 627.00 KB

Other reports you may be interested in

Browse reports by Industry Sector