Asset Report
Hollister (Ivanhoe Restart) (Closed) gold mine
Report summary
The Hollister mine is an underground operation that uses overhand drift and fill methods. Ore is processed at the Esmeralda conventional carbon-in-leach (CIL) plant, 290 miles from Hollister.In November 2013, production was stopped and 182 employees were laid off. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Mining
- Processing
- CAPEX
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
23 December 2015
Mount Muro Restart (Closed) gold mine
Asset Report
Mount Muro Restart (Closed) gold mine
A detailed analysis of the Mount Muro Restart gold mine.
$2,25017 November 2021
Gold Ridge Restart (Closed) gold mine
Asset Report
Gold Ridge Restart (Closed) gold mine
A detailed analysis of the Gold Ridge Restart gold mine.
$2,25005 August 2021
Maricunga (Refugio Restart) (Closed) gold mine
Asset Report
Maricunga (Refugio Restart) (Closed) gold mine
A detailed analysis of the Maricunga (Refugio Restart) gold mine.
$2,250