Mount Muro Restart (Closed) gold mine
Report summary
MOperations were a combination of open pit and underground mining. Open pit mining was the predominant mining method from the Serujan pit. Ore was processed at a conventional carbon-in-leach (CIL) plant.The mine was placed on care and maintenance on 2 August 2014. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Mining
- Processing
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
17 November 2021
Gold Ridge Restart (Closed) gold mine
Asset Report
Gold Ridge Restart (Closed) gold mine
A detailed analysis of the Gold Ridge Restart gold mine.
$2,25005 August 2021
Maricunga (Refugio Restart) (Closed) gold mine
Asset Report
Maricunga (Refugio Restart) (Closed) gold mine
A detailed analysis of the Maricunga (Refugio Restart) gold mine.
$2,25017 April 2023
Kiena (Restart) gold mine
Asset Report
Kiena (Restart) gold mine
A detailed analysis of the Kiena (Restart) gold mine.
$2,250