Asset Report
Honghang EAF - Closed nickel operation
Report summary
Located in Suishan town, Sichuan. Electric furnace treating laterite ore (via rotary kiln drying) to produce 8-13% Ni in nickel pig iron. Production ceased in June 2008 due to high costs of production and falling nickel prices, although it resumed in March 2009. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Long - Closed nickel operation
A detailed analysis of the Long nickel operation.
$2,250
Asset Report
Xuzhuo Jinxiang EAF - closed nickel operation
A detailed analysis of the Xuzhuo Jinxiang EAF - closed nickel operation.
$2,250
Asset Report
Dongmau EAF - Closed nickel operation
A detailed analysis of the Dongmau EAF nickel operation.
$2,250