Asset Report

Huludao (ISF) zinc smelter

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

In 2001 the decsion was made to replace 60kt/a of the vertical retort capacity with an ISF smelter in 2004. This was a key state technical innovation project partly funded by national debt. The plant was designed by Changsha Engineering & Research Institute of Nonferrous Metals and Metallurgy and had a nominal capacity of 60kt/a zinc, 30kt/a lead and 130kt/a sulphuric acid. Construction started in 2003, and the ISF was commissioned in July 2006.

What's included

This report contains

  • Document

    Huludao (ISF) zinc smelter

    PDF 628.99 KB

  • Document

    Huludao (ISF) zinc smelter.xls

    XLS 512.00 KB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Sinter Plant
    • Acid Plant
    • Smelting Furnace
    • Refining
    • Casting Plant
    • Residue Disposal
    • Other
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

Tables

  • Key facts: Table 1

Images

  • Location maps: Image 1
  • Flowsheet

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898