Asset Report

Huludao (ISF) zinc smelter

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

28 November 2018

Huludao (ISF) zinc smelter

Report summary

In 2001 the decsion was made to replace 60kt/a of the vertical retort capacity with an ISF smelter in 2004. This was a key state technical innovation project partly funded by national debt. The plant was designed by Changsha Engineering & Research Institute of Nonferrous Metals and Metallurgy and had a nominal capacity of 60kt/a zinc, 30kt/a lead and 130kt/a sulphuric acid. Construction started in 2003, and the ISF was commissioned in July 2006.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Sinter Plant
    • Acid Plant
    • Smelting Furnace
    • Refining
    • Casting Plant
    • Residue Disposal
    • Other
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

  • Key facts: Table 1
  • Location maps: Image 1
  • Flowsheet

What's included

This report contains:

  • Document

    Huludao (ISF) zinc smelter

    PDF 1.06 MB

  • Document

    Huludao (ISF) zinc smelter.xls

    XLS 446.00 KB