Asset report

Huludao (ISF) zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

In 2001 the decsion was made to replace 60kt/a of the vertical retort capacity with an ISF smelter in 2004. This was a key state technical innovation project partly funded by national debt. The plant was designed by Changsha Engineering & Research Institute of Nonferrous Metals and Metallurgy and had a nominal capacity of 60kt/a zinc, 30kt/a lead and 130kt/a sulphuric acid. Construction started in 2003, and the ISF was commissioned in July 2006.

What's included

This report contains

  • Document

    Huludao (ISF) zinc smelter

    PDF 628.99 KB

  • Document

    Huludao (ISF) zinc smelter.xls

    XLS 512.00 KB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Sinter Plant
    • Acid Plant
    • Smelting Furnace
    • Refining
    • Casting Plant
    • Residue Disposal
    • Other
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898