Asset Report
Ilovitza copper mine
Report summary
Ilovitza will consist of an open pit mine and a conventional mill and flotation processing plant producing a copper concentrate and a gold dore. Mine life is estimated at 20 years. A feasibility report was completed on the project in late 2015 and Wood Mackenzie has assumed an earliest possible production start-up date of 2025. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Mt Garnet (Copper Plant) copper mine
A detailed analysis of the Mt Garnet (Copper Plant) copper mine.
$2,250
Asset Report
Black Butte copper mine project
A detailed analysis of the Black Butte copper mine project.
$2,250
Asset Report
Erdenet copper mine
A detailed analysis of the Erdenet copper mine.
$2,250