Asset Report
Jingxi alumina refinery
Report summary
Commissioned in 2008, SGA is supplied to feed the Xinfa system and for third party sales. Bauxite is supplied from a captive mine with estimated reserves in the order of 200Mt. Power was fully captive as of H1 2014. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Bauxite
- Digestion
- Calcining
-
Environmental
- Red Mud
- Power
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
16 November 2021
Jingxi Tiangui alumina refinery
Asset Report
Jingxi Tiangui alumina refinery
Tiangui project was designed with three phases, 800-ktpa each.
$2,25016 November 2021
Xiaoyi Xinfa alumina refinery
Asset Report
Xiaoyi Xinfa alumina refinery
A detailed analysis of the Shanxi Xiaoyi alumina refinery.
$2,25016 November 2021
Xinwang (Alumina) alumina refinery
Asset Report
Xinwang (Alumina) alumina refinery
A detailed analysis of the Xinwang (Alumina) alumina refinery.
$2,250