Asset Report
Jingxi Tiangui alumina refinery
Report summary
Tiangui project was designed to three phases: 800-ktpa each (one low temperature and two operating at higher temperature). Located in Guangxi province, the refinery imports bauxite through Fangchenggang and Qinzhou ports. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key Issues
- Bauxite
- Digestion
- Calcination
-
Environmental
- Red Mud
- Power
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
16 November 2021
Jingxi alumina refinery
Asset Report
Jingxi alumina refinery
A detailed analysis of the Jingxi alumina refinery.
$2,25004 May 2022
Xinjiang Tianshan aluminium smelter
Asset Report
Xinjiang Tianshan aluminium smelter
A detailed analysis of the Xinjiang Tianshan aluminium smelter.
$2,25016 November 2021
Guixi Huayin alumina refinery
Asset Report
Guixi Huayin alumina refinery
A detailed analysis of the Guixi Huayin alumina refinery.
$2,250