Asset Report
Jinlong copper refinery
Report summary
The refinery is located in Tongling, Anhui Province. The system uses in the Tankhouse is Walker. The capacity of the refinery is 540kt/a of anodes loaded (450kt/a of cathodes produced). Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Emissions
- Tankhouse
Tables and charts
This report includes 4 images and tables including:
- Jinlong Copper Refinery Emission Intensity Quartile Ranking - total global production - tonnes Cu
- Detailed map
- Casting plant
What's included
This report contains:
Other reports you may be interested in
Asset Report
Jinlong copper smelter
A detailed analysis of the Jinlong copper smelter.
$2,250
Asset Report
Yunnan (Kunming) copper refinery
A detailed analysis of the Yunnan (Kunming) copper refinery.
$2,250
Asset Report
Chifeng Jinjian copper refinery
A detailed analysis of the Chifeng Jinjian copper refinery.
$2,250