Asset Report
Kakanda - Kambove SxEw copper mine project
Report summary
The Kambove SxEw project comprises plans to develop an open pit mine together with heap leaching and processing facilities to produce copper cathode and cobalt hydroxide. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- CAPEX
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Carmacks SxEw copper mine project
A detailed analysis of the Carmacks SxEw copper mine project.
$2,250
Asset Report
Tia Maria SxEw copper mine project
A detailed production and cost competitive analysis of the Tia Maria SxEw copper mine project.
$2,250
Asset Report
La Granja SxEw copper mine project
A detailed production and competitive analysis of the La Granja SxEw copper mine project.
$2,250