Asset Report

Kamoto KOV copper mine

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

12 May 2021

Kamoto KOV copper mine

Report summary

The following notes and accompanying analysis cover the production of copper and cobalt in sulphide concentrates and whole oxide ore at the refurbished Kamoto concentrator and the recovery of copper cathode and cobalt hydroxide at the nearby Luilu metallurgical plant. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • CAPEX
    • Kamoto Underground Mine
    • T17 Underground Mine
    • KOV Open Pit
    • Mashamba East Open Pit
    • KITD Tailings
    • Kamoto Concentrator
    • Luilu Metallurgical Plant
  • Royalties

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Kamoto KOV copper mine

    XLS 554.00 KB

  • Document

    Kamoto KOV copper mine

    PDF 1.11 MB