Asset Report

Kansanshi copper smelter

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The smelter started operating in February 2015 and its capacity is 300kt/a anodes. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Emissions

Tables and charts

This report includes 6 images and tables including:

  • Kansanshi Emission Intensity Quartile Ranking - total global production - tonnes Cu
  • Detailed map
  • Flowsheet
  • Feed preparation
  • Smelting process
  • Auxiliary plants

What's included

This report contains:

  • Document

    Kansanshi copper smelter

    PDF 1.58 MB

  • Document

    Kansanshi copper smelter

    ZIP 1.19 MB