Asset report

Onahama copper smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The smelter was constructed in 1965 as a custom smelter using conventional reverberatory/converter technology. Originally the reverberatory furnaces were oil fired but economics dictated conversion to coal firing in 1979. Additionally a tyre shredder and an oil pyrolysis plant were installed to enable used tyres to be consumed as a fuel and to further reduce fuel costs. The cost of tyres is negative i.e. there is a charge for their disposal. However increasing use of tyres by the cement...

What's included

This report contains

  • Document

    Onahama copper smelter

    PDF 631.46 KB

  • Document

    Onahama copper smelter.xls

    XLS 485.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

Images

  • Detailed map
  • Flowsheet
  • Production
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Products: Table 1
  • Costs: Table 1
  • Economic assumptions: Table 1
  • Products: Table 2

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898