Asset report

Kapulo copper mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The Kapulo project covers three separate deposits Shaba Safari North and Safari South. The 2011 feasibility mine plan included only the Shaba deposit. Further definition drilling was on going at Safari North and South which were interpreted as potentially being continuous.

What's included

This report contains

  • Document

    Kapulo copper mine

    PDF 486.99 KB

  • Document

    Kapulo copper mine

    XLS 493.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Infrastructure
  • Operations
  • Costs
  • Sales contracts
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

Asset report

North Mara gold mine

Asset report

Buzwagi gold mine

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898