Asset Report
Karara DSO iron ore mine
Report summary
Karara DSO was a small scale, direct shipping ore (DSO) operation conducted by Karara Mining Limited; a 48/52 joint venture between Gindalbie Metals, an Australian mining company and Chinese steelmaker Anshan Iron and Steel (AnSteel). The initial DSO reserves are depleted with final tonnage extracted in December 2015. No further mining is expected at this site unless new reserves are converted from existing resources.
Table of contents
- Summary
-
Key issues
- Production
Tables and charts
This report includes 12 images and tables including:
- Detail map
- Participation
- Marketable reserves (01/01/2017)
- Production
- Operations
- Infrastructure
- Cash costs
- Cash costs
- Capital costs
- Product quality
- Economic assumptions
What's included
This report contains:
Other reports you may be interested in
Asset Report
Simandou (Blocks 3 and 4) iron ore mine
Rio Tinto retains a 45% interest in Simandou and aims to produce the first tonne in 2025.
$2,250
Asset Report
Nimba (Yekepa) Phase 2 iron ore mine
Phase 2 may commence with the first production in Q4 2024.
$2,250
Asset Report
Hamersley Mines (excl HIY) iron ore mine
Hamersley Mines is Rio Tinto's largest iron ore complex. Combined production from the mine and Gudai-darri is approximately 190 Mtpa.
$2,250