Keetac iron ore mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key issues
- Economic assumptions
Tables and charts
This report includes the following images and tables:
- Detail Map
- Participation
- Marketable reserves (at 01/01/24)
- Production
- Production
- Operations
- Infrastructure
- Cash cost
- Cash cost
- Capital cost
- Product quality
What's included
This report contains:
Other reports you may be interested in
Eliwana iron ore mine
FMG's 30 Mtpa Eliwana ramped up and is expected to be its lowest cost operation.
$2,250Chichester Hub iron ore mine
Chichester Hub is a 90Mtpa operation in Western Australia's Pilbara iron ore region. It includes FMG's Christmas Creek and Cloudbreak mines.
$2,250Simandou (Blocks 1 and 2) iron ore mine
Simandou is progressing well and is on track to meet the hard-pushed deadlines.
$2,250